spacer.png, 0 kB
spacer.png, 0 kB
spacer.png, 0 kB
Home arrow 24/7 Spill Response

Document details

Details for Case Study 3 - Duralife and Bundguard
PropertyValue
NameCase Study 3 - Duralife and Bundguard
Description
Along with the rest of the UK electricity generation, distribution and supply industry the client has a large number of transformer sub-station sites which must be brought up to compliance standards.  Even modest sized electricity transformers contain large quantities of oil for cooling and insulating. For many years there has been gradual leakage and occasional spills from routine re-filling and emptying so at most sites, without satsifactory containment, there has been a history of possible localised ground contamination and the risk of wider pollution in the event of major failure. All electricity companies have been aware of the problems of inadequate oil containment and have been making good, steady progress in upgrading their sites over the last ten years or so but this is a very costly exercise.

FilenameCase_Study_3_Duralife_and_Bundguard.pdf
Filesize308.89 KB
Filetypepdf  (Mime Typeapplication/pdf)
Creatoradmin
Created On: 16.08.2005 14:20
ViewersEverybody
Maintained by
Hits1732Hits
Last updated on 16.08.2005 14:21
Homepage
spacer.png, 0 kB